EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
-
Start-Rudder
-
Rudder completed
-
Rudder completed
-
Vertical Stab
-
Vertical stabilizer
-
Vertical Stab frame...
-
Vertical stabilizer...
-
Vertical stabilizer...
-
Riveting vertical...
-
Finish riveting left...
-
Rivet right side of...
-
Tail pull handle and...
-
Horizontal...
-
Rolling elevator skins
-
Elevator frame...
-
Elevator horn...
-
Elevator horn...
-
Riveting elevator...
-
Rivet servo ribs...
-
Drill spars on...
-
Deburring horizontal...
-
Deburring horizontal...
-
Countersink Horiz...
-
Dimple Horiz Stab...
-
Riveting Horizontal...
-
Riveting horizontal...
-
Riveting horizontal...
-
Elevator frame prep...
-
Elevator assembly
-
Rivet top elevator skin
-
Drill trim tab spar,...
-
Rivet trim tab
-
Prep elevator for...
-
Attach trim tab hinges
-
Attach trim tab to...
-
Elevator tips start...
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
May 18, 2020
Riveting vertical stabilizer
- (.5 hour)
Category: Empennage
Drilled left side skin to fit through forward spar of vertical stab and pulled a few rivets. Short night
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.